Data centers are pulling hard on the U.S energy grid, in turn increasing demand for grid-scale battery storage systems. These complex systems are used for peak shaving and load balancing, and the plants making them need production lines that keep up with demand.As proof, in the second quarter of 2026, U.S. energy storage deployments hit a record 18.9 GWh due to longer system durations and expanding power demand from data center operations, according to the Q3 2026 U.S. Energy Storage Monitor from Wood Mackenzie and the American Clean Power Association.
Our client is a U.S. manufacturer of energy storage systems for electric grids, and they came to AZO while designing a greenfield plant. They wanted a highly flexible mixing line with as much automation as possible. The result? A single raw material handling system that could eventually feed three mixers, with AZO designing the full scope for solids, liquids, and controls.
The customer wanted the mixing line automated as far as the process would allow, fed by one raw material handling system. That system had to serve a potential of three mixers over time, so it needed to be easily scalable. That meant a high level of automation — automated recipe control, mixer feeding and mixer discharge — with manual labor only for handling raw material discharge into the system.
The challenge was that more than five raw materials entered the system and they behaved nothing alike: different bulk densities, flow behavior, and particle shapes. In particular, PTFE (polytetrafluoroethylene) is a difficult ingredient to handle at room temperature, which means keeping it constantly below 15° C (59° F) through storage and handling.
After mixing, the material got harder to deal with because it was prone to de-mixing, so it had to move fast and gently. The final ingredient handling solution needed to account for the following:
We started with testing before design. In our test center, we conducted conveying trials on the mixed material to determine the best conveying method to protect the material from de-homogenising. From there we engineered the system to include:
This project is still in progress, and we’ll provide updates as the solution is implemented. Battery storage demand is increasing, and plants built for it need production lines that can add capacity without a second capital project.
At an early stage of such a project, we are able to support the customer in finding the best solution according to their needs and preferences. This starts at an early stage material flow and moves forward to designing concepts which are then evaluated together with the customer according to the criteria identified at the early stage. By involving each employee level from operator to management, new perspectives are introduced to design the most suitable solution for the customer.
If you’re planning a greenfield project or sizing a line for volume you don’t have yet, we can look at the process with you. Submit a request for proposal to start the conversation.